Installation Steps Of Led Street Light Factory

  • July 12, 2020 8:14 PM PDT
    When lifting the light pole, you must pay attention to the surrounding environment, such as overhead wires, trees, billboards, scaffolding, buildings, etc., and take safety measures. Before lifting the lamp post, first check whether the fasteners in each part are firm, whether the lamp head is installed correctly, and whether the light source is working properly. Then debug the system to see if it is working properly; loosen the cable of the battery board on the controller and the light source should work; connect the cable of the battery board and the light should go out.

    At the same time, carefully observe the changes of the indicator lights on the controller. Only when everything is normal can it be hoisted and installed. When lifting the main light pole, pay attention to safety precautions. The screws must be tightly fastened. If there is a deviation in the sun angle of the component, you need to adjust the direction of the sun so that it is completely south.

    Put the lifting rope on the proper position of the light pole, slowly lift the lamp, and pay attention to avoid the crane wire rope from damaging the battery assembly. During the adjustment process, when the [url=https://www.xiangruilight.com/product/flood-light-mars-series/100w-outdoor-slim-led-floodlight-ip65-mars-series.html]100w outdoor slim led floodlight[/url] is completely off the ground or completely off the load, at least two people should be installed. The personnel use a large wrench to clamp the flange to prevent the lamp from swinging at the bottom during the lifting process and causing the upper end of the lamp to rub against the crane rope and damage the spray coating. When the lamp is lifted directly above the foundation, slowly lower the lamp, while rotating the lamp post, adjust the lamp head to face the road, and the long hole on the flange is aligned with the anchor bolt. After the flange is dropped on the foundation, put 30 flat washer (or 24 flat washer), 30 spring washer (or 24 spring washer) and M30 (or M24) nut in turn, and adjust the verticality of the lamp post with a horizontal ruler. If the lamp post is not perpendicular to the ground, you can put a gasket under the lamp post flange to make it perpendicular to the ground, and finally tighten the nut evenly with a wrench. Before tightening, apply thread locking glue. For M24 bolts (class 8.8), the rotating torque is 650.6N.M; for M30 bolts (class 8.8), the tightening torque is 1292.5N.M.

    [url=https://www.xiangruilight.com/]Led Street Light Factory[/url] removes the lifting rope and checks if the battery pack is facing south. Otherwise, make adjustments. When adjusting the direction of the battery assembly, use a long drop device to send the installer 1 to 2 to the appropriate height. The installer loosens the bolts that fasten the upper lamp post assembly one by one with a wrench, and then twists the upper lamp post assembly based on the compass At a suitable position, finally tighten the fixing bolts of the lamp pole assembly one by one, and ensure that the bolts are evenly stressed.