Event Details

  • The process of installing Led Public lighting(CLASSICLEDLIGHT) https://www.classicledlight.com/ is exactly what kind of process, how to correctly install the public lighting, and what are the relevant attention details that need to be paid attention to in this process. Below, we will arrange the constant source lighting for you and related matters concerning the correct installation of LED public lighting. In the process of installing LED public lighting, first insert the LED public lighting interface into the light post, tighten the hexagon socket head cap screws, and pay attention to keeping the LED public lighting balance during the installation process. In this process, the details should not be careless. The product should be sleeved into the mounting bracket screws, and the screws should be locked after fixing the product and the horizontal angle. Install the light on the street light bracket and lock it at the screw hole position. Adjust the elevation angle of the light so that the light-emitting angle of the light meets the specified requirements of the light. This process needs to be accurate. In addition, the working process must ensure that the voltage is within the rated range, beyond the rated voltage will cause irreparable damage. When installing LED public lighting, we need to pay attention to the following details: 1. The installation height, elevation angle and installation direction of adjacent street lights should be consistent. 2. The longitudinal centerline of LED light installation and the longitudinal centerline of light arm shall be consistent, the horizontal line of light shall be parallel to the ground, and there shall be no inclination visually after fastening. 3. The connection between the light cap and light pole must be firmly standardized. 4. In the led street light arm, light panel, light pole threading can not have joint, threading orifice or nozzle should be smooth, no burr, and insulation casing or bandage should be used, bandage length shall not be less than 200mm. 5. All kinds of nuts should be tightened with gaskets and spring pads. After fastening, the threaded nut shall not be less than two pitches. If you are ready to upgrade to a more efficient lighting system, for more information, please click public lighting https://www.classicledlight.com/ .
  • 8/7/19 at 1:00 AM -
    8/22/19 at 1:00 AM
  • Category
  • click to rate
  • RSVPs
    • 1 attending
    • 0 maybe attending
    • 0 not attending
    • 0 awaiting reply

Guest Responses

This event has 1 guest.